S-34.1, r. 2 - Regulation respecting petroleum exploration, production and storage on land

Full text
68. The authorization holder must restore the activity site as soon as the work ends or as soon as the meteorological conditions allow.
O.C. 1252-2018, s. 68.
In force: 2018-09-20
68. The authorization holder must restore the activity site as soon as the work ends or as soon as the meteorological conditions allow.
O.C. 1252-2018, s. 68.